ACCESS CONTROL
|
When attending to a repeater ,or pop these are the steps to follow;
|
|
1. Contact NOC or Support and sign up for keys.
|
|
|
2. Carry a valid Company Identification.
|
|
|
3. If the site contacts are available the Engineer should ask NOC / SUPPORT to inform the building management of the pending visit and its purpose. (Some buildings require a letter before allowing Access, the technical coordinator will prepare it on request) ;
|
|
|
4. Visit the site with a car clearly to identify the company.
|
|
|
5. On arrival to the site the engineer should present the relevant particulars ( Letters /ID) to the building management and security officers for approval.
|
|
|
6. When Access is granted , proceed with the work.
|
|
|
Completion of tasks
|
|
|
1. Make sure the door is shut and locked up..
|
|
|
2. Surrender the keys to NOC/SUPPORT
|
|
|
3. Sign out of the log book.
|
|
|
EVERYDAY HOUSEKEEPING
|
|
|
REPEATER - internal
|
1. COOLING - Make sure the repeater is cool (ceiling fan and/or air conditioner working). If not escalate to SUPPORT /NOC to follow up.
|
|
2.LABELLING - After installation of radio or indoor units. Make sure all cables are clearly labelled.( patch cables, power cables, power units).
|
|
|
3. CLEANSINESS - always leave place in tidy manner, better than you found it (throw away all trash and all unwanted components).
|
|
|
REPEATER - Tower
|
TBA
|
|
SCHEDULE MAINTENANCE
|
Scheduled maintenance is to be carried out at regular periods , at least once every year for each REPEATER OR POP.
|
|
TASK SHEET
|
|
|
REPEATER / POP
|
1. Dust -Blow the dust from all active components.
|
|
2. Labelling - labelling all components.
|
|
|
3. Sweeping - The floor area should always clear of any particles and objects.
|
|
|
ELECTRICALS
|
1. AIR CONDITIONER - Cleaning of the Air conditioner by qualified technicians.
|
|
2. BATTERY - Maintenance and measurement of the output.
|
|
|
3. INVERTER - conditional check
|
|
|
TOWERS
|
1. All towers to be regularly assessed for rust and painted if condition necessitates
|
|
SCENARIO 1
|
|
|
POWER MONITOR
|
If the power monitor is DOWN for more than 6 hours
|
|
SOLUTION
|
|
|
Contact the building management send an engineer to attend
|
|
|
CHECK
|
|
|
1. Electricity source (Tanesco)
|
|
|
2. MCB for a Tripped Circuit.
|
|
|
3. Faulty AVS/AVR.
|
|
|
4. FAULTY power monitor (router) if everything else ok.
|
|
|
If problem is found with the above escalate to electrician
|
|
|
SCENARIO 2
|
|
|
GENERAL POWER FAILURE
|
In the case of a general power failure.
|
|
1. Check the power source for the switch and the state of switch.
|
|
|
2. Check status of UPS plugged into the switch.
|
|
|
3. Check the INVERTER functionality. (LED)
|
|
|
4. Check theBATTERY source.
|
|
|
5. Check the AVS/AVR
|
|
|
6. Check the power availability.
|
|
|
IF any problem is found with any of the above escalate to the electrician or NOC/SUPPORT
|
|
|
SCENARIO 3
|
|
|
POWER Fluctuations
|
1. Check the UPS
|
|
2. Check the INVERTER.
|
|
|
3. Check the BATTERY source.
|
|
|
4. Check the POWER SOURCE for low voltage.
|
|
|
WIMAX BSDU
|
If the WIMAX Bsdu goes down. check power supply unit. and replace.
|
No comments yet.
Cheatography n. The art of mapping complex subjects into clear, instantly navigable reference guides.