• Impact statement/assessment
|
|
• Implementation Plan
|
|
• Tasks or milestones needed to implement change
|
|
• Back out plan
|
|
• Anticipated downtime start and end times
|
|
•Draft customer notification of anticipated downtime
|
|
• Communications plan w/draft communications*
|
|
• Test Plan, Test Case, and Test Summary Report*
|
|
• Other plans as needed (e.g. capacity, transition, and release and deployment plans)*
|
|
Low in risk, impact and visibility
|
|
Relatively common
|
|
The tasks are well known, documented and proven
|
|
There is a defined Roll-Back plan
|
|
Testing may be required
|
|
RFC Submitted into SDP
|
|
Pre-authorized change - CAB approval not required
|
|
Report weekly to CM/CAB
|
|
Any change that does not alter the specification of a Configuration Item (CI)
|
|
Testing of an application, service or development project that will be introduced as a part of normal change
|
|
**Some standard changes are not documented in the change management process; but instead are documented in incident management process using a ticket submitted to the Service Desk.
|
|
**However, a normal or emergency change may be triggered by a ticket in the incident management process
|
|
**Therefore, it is not a standard change just because it started as a ticket within the incident management process… you must evaluate each change or trigger individually
|
|
Reoccurs on a standard timeframe (weekly, bi-weekly, monthly, etc...)
|
|
Has same characteristics as a Standard Change but requires approval by the CAB
|
|
Report completed occurrences to CM/CAB
|
|
Low in risk, impact and visibility
|
|
Relatively common
|
|
The tasks are well known, documented and proven
|
|
There is a defined Roll-Back plan
|
|
Testing may be required
|
|
RFC Submitted into SDP
|
|
Any change that does not alter the specification of a Configuration Item (CI)
|
|
Testing of an application, service or development project that will be introduced as a part of normal change
|
|
**It is possible for a recurring normal change that has been implemented successfully a couple of times to become a standard recurring change for future deployments.
|
|
Standard
|
|
Standard Recurring
|
|
Emergency
|
|
Normal
|
|
Most changes should go through the normal or standard change process.
|
|
Emergency changes should not occur very often.
|
|
If a change is implemented outside one of these three processes (standard, normal, emergency), it is an unauthorized change.
|
|
Requires immediate attention
|
|
Usually in response to break/fix issue. They should never occur because of poor planning.
|
|
Restoring service, preventing an outage or repairing an error that is severely impacting business
|
|
Testing reduced or forgone
|
|
ECAB notified verbally or via email
|
|
RFC submitted w/in 1 business day of implementation or fix
|
|
ECAB approves
|
|
A location is without a service
|
|
There is a severe degradation of service needing immediate action
|
|
A system/application/component failure causing a negative impact on business operations
|
|
An enterprise application is unavailable
|
|
A response to a natural disaster
|
|
A response to an emergency business need
|
|
A security breach requiring a patch to an enterprise server, enterprise application or a large number of workstations
|
|
Hardware malfunction has required a SQL database to be restored to another server
|
|
Corrupt data from an interface requires the database to be restored from backup
|
|
Reboot of a domain controller in a network outage situation
|
|
Nola.gov website is down
|
|
Testing may be required
|
|
Not an emergency or standard change
|
|
RFC required w/ supporting documentation
|
|
CAB approves
|
|
Change that results in business interruption during regular business hours
|
|
Changes in any system that affects disaster recovery or business continuity
|
|
Introduction or discontinuance of a service
|
|
Move new development projects into production
|
|
Create/update an image for a large number of computers
|
|
Apply/install an enterprise application upgrade, service pack, patch, hotfix, etc…
|
|
Apply/Install a server operating system patch, hotfix, service pack, etc…
|
|
Add, relocate or decommission a server
|
|
Implementing a new domain policy
|
|
Upgrading domain controller
|
|
Install or relocate a printer that is high impact for a mission critical function
|
|
Changes to active directory
|
|
Hardware failure to be fixed by a vendor
|
|
Implemented without approval of Change Manager or CAB
|
|
Requires submission of incident report & RFC; maybe incident response plan
|
|
Reported to Change Mgr & Security Admin
|
|
CAB determines… Valid? Reversed? Privileges revoked? Disciplinary action?
|
Change Management Process as used by the Office of Information Technology at the City of New Orleans