Consultant-Led Design-Bid-Build
|
AV Designer is contracted to consultant and both are responsible for Design
|
|
Integrator-Led Design-Build
|
AV integrator is responsible for Design and Installation of of AV and is contracted to Architect for design and to GC for install
|
|
Consultant-Led Design-Build
|
AV consultant provides program/project management while Integrator provides designs and installation
|
|
Consultant/Integrator Team Design-Build
|
AV Consultant and Integrator are contracted as single entity and work together though they are seperate buisness entities
|
|
Owner Furnished Equipment/Integrator Installed
|
owner supplied equipment, Integrator installed
|
|
Owner Furnished Equipment/Owner Installed
|
owner supplied equipment and owner installed
|
|
1. Review existing documents and facilities
|
Architectural, Organiztional, Technical documents
|
|
2. Benchmark comparable facilities
|
Visit other facilities
|
|
3. Conduct program meetings
|
reveal what a system currently does, what it needs to, and what people wnat it to do
|
|
4. Write program report
|
report containing user needs and a conceptual/functional system description as well as impact it will have on existing spaces
|
|
5.Distribute program report
|
owner, end users, IT, architects, construction manager, GC, integrators, cost estimators,
|
|
6. Approve the program report
|
formally approved report becomes basis for the design
|
|
executive summary
|
brief overview of entire document
|
|
systems descriptions
|
description of each type of system
|
|
infrastructure considerations
|
impact to lighting, electrical, mechanical, acoustical, data/telecom, structural, architectural, interior, budget impacts
|
|
Special Issues
|
major obstacles, schedule issues, specific options for specific spaces
|
|
Preliminary budget and terms
|
Estimate of cost
|
|
breakdown of probable cost
|
basic breakdown of costs of rooms or equipment
|
|
additional costs
|
labor, equipment, taxes, markup, contingencies
|
|
operational staff expertise required
|
|
|
maintenance budget and life cyle expectations
|
|
|
Scope: what is being done
|
|
Time: Effort and Duration
|
|
Cost: Labor and Equipment
|
|
Quality: Ensuring performance meets expectations
|
|
Risk: Threats, Opportunities, and Response Strats
|
|
1. Talk to stakeholders
|
|
2. Review exisiting documents3
|
|
3. Site survey
|
|
4. Conduct program meetings
|
|
5. Write program report.
|
|
1. Create Request for Qualifactions (RFQ) and Request for Proposal (RFP)
|
|
2. Target potential providers
|
|
3. send out RFP/RFQ to potential providers
|
|
4. Review Qualifications response without opening proposal and create "short list"
|
|
5. interview "short list" and rank them
|
|
6. Open proposal for the higest ranked provider and if fee is within range, they win the bid
|
|
7. If fee is too high move on to the next highest ranked provider until one falls within budget.
|
|
1. Create Request fo Qualifications (RFQ)
|
|
2. Target potential providers
|
|
3. send out RFQ to potential providers
|
|
4. Read responses and create "short list" of 3-5 providers
|
|
5. Interview "short list" and rank them
|
|
6. Negotiate with highest-ranking firm for project fee
|
|
7. If acceptable fee and scope cannot be established move to next provider
|
|
Plan Drawing
|
Top view floor plan
|
|
Schematic Layout
|
Shows relationships between objects. Often not to scale
|
|
Section Cut Flag
|
Shows which section drawing to look at
|
|
Architectural drawings
|
As-built drawings or design for project in progress
|
|
Reflected Ceiling
|
Shows the elements in the veiling
|
|
Elevation
|
View of a space from the front, back, or side
|
|
Section
|
View of an interior in the vertical plane
|
|
Detail
|
Depicts small items that need to be enlaged to show how to install
|
|
Fiber
|
ST, LC, SC connectors; single or multimode
|
30km range, 40 Gbps
|
|
Ethernet
|
8p8c or RJ4, bidirectional
|
1gb at 300ft, 10gb at 150ft
|
|
RS232
|
DB-9 connector, bi directional, unbalanced
|
50ft, 20kps, 2 devices
|
|
RS422
|
DB-9/DB-25 Connector, balanced
|
4000ft up to 10 devices, 10Mbit/s
|
|
RS485
|
5 pin xlr, bi directional
|
32 devices or 256 using DMX, 4000ft 10Mbit/s
|
|
1. Programming
|
|
2. Building
|
|
3. AV bid
|
|
4. Move-in
|
|
Owner
|
End-User, Facility Manager, AV Technology Manager, Building Committee, Buyer, Contract Rep
|
|
Design
|
Architect, AV Designer, Interior Designer, most Consultants
|
|
Installation
|
General Contractor, AV integrator, Contractors
|
|
Management
|
Developer, Construction Manager, Building Management Agency, Move Consultant
|
|
form SF330
|
|
form A350TM-1986
|
|
Ground Fault Interrupt Circuit
|
|
Core Balance Relays
|
|
Earth Leakage Circuit Breakers
|
|
Residual Current Devices
|
|
AS
|
Above Slab
|
|
CL
|
Centerline
|
|
CM
|
Construction Manager
|
|
Dia
|
Diameter
|
|
VIF
|
Verfied in Field
|
|
AFF
|
Above Finished Floor
|
|
E.
|
East
|
|
E.C.
|
Empty Conduit
|
|
EC
|
Electrical Contractor
|
|
(E) or EXG
|
Existing
|
|
ELEC
|
Electrical
|
|
Fut
|
Future
|
|
GC
|
General Contractor
|
|
MISC
|
Miscellaneous
|
|
NIC
|
Not in Contract
|
|
NTS
|
Not to Scale
|
|
OC
|
On Center
|
|
OD
|
Outer Diameter
|
|
OFCI
|
Owner Furnished-Contractor Installed
|
|
OFE
|
Owner Furnished Equipment
|
|
OFOI
|
Owner Furnished-Owner Installed
|
|
PM
|
Project Manager
|
|
RCP
|
Reflected Ceiling Plan
|
|
SECT
|
Section
|
|
red
|
R-Y/ Pr /Cr
|
|
green
|
y
|
|
blue
|
B-Y/Pb/Cb
|
|
VGA or SD
|
640x480
|
4:3
|
|
SVGA
|
800x600
|
4:3
|
|
XGA
|
1024x768
|
4:3
|
|
XGA+
|
1152x864
|
4:3
|
|
SXGA
|
1280x960
|
4:3
|
|
UXGA
|
1600x1200
|
4:3
|
|
WXGA
|
1280x768
|
5:3
|
|
SXGA
|
1280x1024
|
5:4
|
|
HD
|
1366x768
|
16:9
|
|
HD+
|
1600x900
|
16:9
|
|
HD-1080
|
192x1080
|
16:9
|
|
WXGA
|
1280x800
|
16:10
|
|
WSXGA
|
1440x900
|
16:10
|
|
WSXGA+
|
1680x1050
|
16:10
|
|
WUXGA
|
1920x1200
|
16:10
|
|
QHD
|
2560X1440
|
16:9
|
|
2K
|
2048X1080
|
1:1.77
|
|
4K
|
3840X2160
|
1:1.9
|
|
8K
|
7680X4320
|
16:9
|
|
Adjust timing/signal strenth
|
|
Ensure continuous transistions, ie avoid crash switching
|
|
Correct deficiences in the orginal signal
|
|
Adjust picture color, contrast, brightness
|
|
Change format of signal
|
No comments yet.
Cheatography n. The art of mapping complex subjects into clear, instantly navigable reference guides.