|
When do you work with TU?
When several loads with different ASN are combined together into one sheet.
|
|
When do you need to activate TU?
When You are the first person to start receiving that particular freight
|
|
How do you activate TU?
Inbound Process ->>>TU Checkin ->>> Scan TU ->>>Enter A.Door (Same as P.Door) ->>>F3 ->>>Yes ->>> F7
|
|
What next after activating TU?
You Start Receiving
|
|
When do you Change Bin?
You Change Bin if an item is too big or too small for a location
|
|
How do you Change Bin?
Scan WO ->>> F1 (Ch Bin) ->>> Enter/Scan the new Bin ->>>Continue the Putaway Process as written above
|
|
A- Active Location
|
Anything From 01-05 level e.g 15-AA-001-04-01
|
|
R - Reserve Location
|
Anything above 05 level e.g 15-AA-001-06-01
|
|
B - Bulk Location
|
Big items that goes into Flooring Locations
|
|
Here We seperate by labels and locations
|
|
All Active labels (01-04) levels should be arranged on bakers rack for putaway convenience
|
|
All Reserve labels and Active label Level (05) e.g 15-AA-001-05-01 should be seperated according to aisle
|
|
All Bulk Label Should be Placed on Blue Pallet (each article on a pallet)
|
No comments yet.
Cheatography n. The art of mapping complex subjects into clear, instantly navigable reference guides.